01 / For civil and trade contractors
Quote. Scope. Verify.
Pricing a job without seeing the site costs margin. Proving the work was done to spec after the fact costs time, and sometimes the argument. We give you the measurements, access constraints and site conditions to price the job without a site visit, then the dated as-built record that shows it was completed as specified.
Each touchpoint returns a short report: an orthomosaic with measurements marked, a scoping summary of condition, materials and drainage, or a verification record comparing the finished work against the scope. On larger jobs the same capture repeats as progress reporting.
- Measured orthomosaic of a site before you quote it, with access issues and constraints marked
- Scoping record of condition, materials, drainage and site constraints ahead of mobilisation
- As-built verification showing the finished work against the scope, with measurements
- Evidence for a variation or claim where the scope changed on site
- Progress reporting for a larger job, visit by visit against the programme